The nine silkscreen clearance locations, three mask slivers and three same-net copper notches from the previous audit are resolved. Both IC Genie drawings stay exactly where you placed them.

Correction checks passed. Native Fusion DRC: zero errors. Unrouted connections: zero. Independent geometry checks: zero remaining findings in the corrected categories. Saved Fusion parent/board v8, schematic v4; schematic circuit and drawing content are unchanged.
0native board errors
0unrouted connections
0remaining corrected-category findings
v8saved Fusion board
Updated board & mask PDFCorrected boardMeasurement recordElectrical design

Checked 5 October 2026 against JLCPCB’s PCB capabilities, for two-layer FR-4, 1 oz copper, 1.6 mm nominal thickness and a routed 32 × 82 mm outline. Numerical tolerance: 0.002 mm.

What changed

Cover routing vias; preserve the artwork

All 59 routing vias are now tented on both faces. Thirty forced mask openings were removed. This resolves the nine silk-to-exposed-via locations and the J4 pad-to-via mask sliver. The six dedicated test pads and connection pads remain exposed.

Both Genie drawings, every text label, the board outline, mounting holes and all 56 component positions match the manually cleaned v7 board.

Give the mask and copper clean edges

Mask expansion is 0.01 mm per side, producing 0.150 mm minimum mask bridges at the USB connector. The project mask-to-silkscreen rule is now 0.15 mm.

Three compact same-net repairs fill the SW, INA and IND notches. Nine short connected segments were added; the SW repair is 0.50 mm wide. All original traces and net contact lists remain intact.

Measured after correction

FeatureCriterion, mmMeasured, mmResult
Trace width0.100.254Pass
Different-net copper spacing0.100.200Pass
SMD pad spacing0.150.250Pass
Drill edge separation0.450.500Pass
Via drill / pad0.15 drill minimum0.300 / 0.600Pass
PTH annulus0.25 recommended0.325Pass
Copper to routed edge0.200.300Pass
Mask bridge0.10 / 0.13 by color0.150Pass
Mask opening to other-net trace0.100.200Pass
Graphic to exposed copper0.150.276 top / 0.284 bottomPass
Graphic to mask opening0.20 project target0.266 top / 0.274 bottomPass
Silk stroke / text height0.15 / 1.000.15 logo / 1.00 textPass

The mask-bridge check conservatively uses actual mask opening separation, compared with JLCPCB’s published 0.10/0.13 mm guidance by color. The 0.01 mm expansion stays inside the published mask capability. Tenting is ordinary mask coverage; no epoxy fill or plugging is assumed. JLCPCB mask guidance.

Corrected detail views

Top outlines / tented vias
Top outlines / tented vias
Via copper is covered; outline strokes unchanged.
Bottom Genie / tented vias
Bottom Genie / tented vias
Large artwork is preserved in its chosen location.
J4 switch / tented via
J4 switch / tented via
The narrow via-to-pad mask sliver is removed.
J5 USB shell / mask bridge
J5 USB shell / mask bridge
Both narrow mask bridges now measure 0.150 mm.
SW / repaired copper
SW / repaired copper
The compact repair uses 0.50 mm copper.
INA / repaired copper
INA / repaired copper
The notch is filled with connected copper.
IND / repaired copper
IND / repaired copper
The notch is filled with connected copper.

Verification record

Fusion rebuilt both ground pours before the final DRC. The schematic remains linked, with the same 37 nets and 56 components. All 83 close trace-segment pairs in the coarse geometric search are covered by connected copper; no exposed same-net notch remains in that test.

The independent audit covers exported discrete traces, pads, vias, holes, mask openings and silk geometry. Fusion checks the filled-plane connectivity; final Gerbers are a separate release step. The 13 existing schematic supply-name ERC warnings are unchanged.

Exact change verification · Native checks · Cloud save record · Updated design rules

Still a prototype

The reported geometry findings are corrected. Before ordering, review the final Gerber/CAM package and assembly sourcing, synchronize Carrier C into the Rev B mechanical model, trial-fit the USB connector and SuperMini, and complete the previously documented electrical bench tests. No fabrication order or assembly release has been issued.